| 1. | Study on operation simulation and optimization of pumped storage power stations 抽水蓄能电站运行模拟与优化方法研究 |
| 2. | Shaft excavation and lining construction in shisanling pumped storage power station 十三陵抽水蓄能电站竖井开挖及衬砌施工 |
| 3. | Excavation technology of upper reservoir at huilong pumped storage power station in nanyang 南阳回龙抽水蓄能电站上库开挖技术 |
| 4. | Construction survey technology for upper reservoir of zhanghewan pumped storage power station 张河湾抽水蓄能电站上水库施工测量技术 |
| 5. | Study on inclined penstock excavating technology in huizhou pumped storage power station project 惠州抽水蓄能电站高压斜井开挖方案选择 |
| 6. | Research on system configuration of pumped storage power station mutually complemented by wind and light energy 风光互补抽水蓄能电站系统配置研究 |
| 7. | Analysis of the underground works in - situ stress measurement of shenzhen pumped storage power station 深圳抽水蓄能电站地下厂房地应力测试成果分析 |
| 8. | Study on hydraulic characteristic of escher - wyss wyepiece of xilongchi pumped storage power station 西龙池抽水蓄能电站内加强月牙肋岔管水力特性研究 |
| 9. | Study of seismic effects and seismic dynamic parameters of a large pumped storage power station site 大型抽水蓄能电站场地地震动效应及设计地震动参数研究 |